× REQUEST A SAMPLE

DEMONSTRATION & TRAINING

Each Band of Ty-Gard DS® can be installed in approximately 3 minutes. * This animation is for demo purposes only. For a specific load pattern recommendation please contact us. Scroll down to view the Step by Step walkthrough guide.

WATCH VIDEO

STEP BY STEP INSTALLATION GUIDE

SCROLL

INSTALLATION INSTRUCTIONS

Step 1

Prepare


Cut two sections of Ty-GardDS® and one section of Ty-PatchDS® for each band required. Peel away the release liner and apply the exposed adhesive surface to the sidewall in the predetermined position. Apply pressure with a bonding roller or squeegee.

Step 2

Load


Finish loading cargo and pull the Ty-GardDS® strips across the face of the load overlapping ends approximately 1 ft (30cm).

Step 3

Tension


Insert the Ty-Tool® down through the overlapping bands and place the magnet as shown. Cut excess overlap if necessary. Use the small wrench to tension.

Step 4

Seal


Remove release liner from the 5ft length of Ty-Patch and place across the tensioned Ty-GardDS® barrier. Apply pressure with a bonding roller or squeegee.

WATCH VIDEO

NEXT STEP
DOWNLOAD BROCHURE VIEW DEMONSTRATION REQUEST A SAMPLE REGULATIONS